Customization: | Available |
---|---|
After-sales Service: | Lifelong |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
Electrocoagulation(EC) or Electrical Flocculation technology is a sewage treatment method that breaks the stable state of suspended solids, emulsified or dissolved pollutants in water by introducing direct current into the water. Compared with traditional chemical flocculation, electrical flocculation is an efficient and environmentally friendly water treatment technology without adding chemical or adding a small amount of flocculant, with low operation and maintenance cost, stable treatment effect and no secondary pollution of water quality and sediment.
Working Principle
Electrocoagulation technology using electrochemical principle, such as aluminum, iron alloy as the main metal electrode, with the aid of function produce electrochemical reaction with high frequency dc power supply, to convert electrical energy into chemical energy, at the expense of the anode metal electrode produce metal cation flocculating agent, through condensation, in addition, reduction and oxidation decomposition of pollutants from water separation, the technique of purifying water body.
Main Feature
• Low investment costs
• Low operating costs
• Low maintenance costs
• No need to add any chemicals
• Small footprint
• Simple operation, high degree of automation
• Short processing time and high processing efficiency
• Adapt to a wide range of wastewater, can treat a variety of pollutants
• Equipment treatment produces less sludge, high density of sludge
Application
Electrocoagulation can be widely used in many wastewater treatment industries. Such as electroplating wastewater, washing wastewater, and textile bleaching wastewater, paper mill wastewater, slaughter wastewater, waste water, food and beverage manufacturers oil refinery wastewater, oil field wastewater, pharmaceutical wastewater, mining wastewater, waste leachate wastewater, agricultural wastewater, paint dye, pigment, such as waste water, waste water cooling towers, wood processing waste water, the traveling scenic area sanitary sewage, It can also be used for sewage purification at the bottom of the ship and port catchment area.
Process | Air flotation | Flocculation | Oxidation | Reduction |
Main Function | Oil Removal Decolorizing SS Removal Pretreatment |
Decolorizing SS Removal Pretreatment |
Pretreatment Deep treatment Break complex forming |
Pretreatment |
Traditional Process |
Ordinary air flotation
The bubble is larger, and the removal effect of tiny oil particles and suspended matter is poor, so it needs to add agents, and the organic pigment can hardly be removed |
Dosing flocculation
Dosage needs to be adjusted according to the different water quality, the sludge production is large, the drug cost is high, the treatment effect is unstable, almost can not remove organic pigment |
Oxidant oxidation
Low oxidation rate, dosage changes with water quality, not easy to adjust, high pharmaceutical costs |
Reduction with reducing agent The reduction rate is low, the dosage changes with the water quality, it is not easy to adjust, and the drug cost is high |
Electrochemistry | The bubbles produced are tiny and can remove pollutants from tiny particles without the need to add additional agents. |
There is no need to add flocculant, and the change of water quality has little influence on the treatment effect. The treatment effect is stable and the sludge production is small. | Without adding oxidant, the oxidation efficiency is high, the breaking of the collateral is more than 99%, and the effluent B/C is more than 0.35 stable. |
The reduction rate is above 99.5% without adding reducing agent |
Application | Floating oil waste water The desulfurization wastewater Papermaking wastewater Coal chemical wastewater Petrochemical wastewater |
Printing and dyeing wastewater Pharmaceutical wastewater |
RO concentrated water treatment Coke copper wastewater Electroless nickel plating wastewater Wastewater containing complex compounds High concentration wastewater |
Chromium plating wastewater |
Our Company
Our Products
Our Customers
Our Certificate
Q1:Are you a factory or trading company?
We are a real manufacturer who can offer you both the most competitive price and top quality products.
Q2:Where is your factory located? How can I visit there?
Our factory is located in Qingdao City Shandong Province, All our clients, from home or abroad, are warmly welcome to visit us!
Q3:Can you put my company brand (logo) on the products?
Yes,we support OEM/ODM service,the customize process as follows:
1.Customers put forward personalized customization requirements.
2.Our engineer draw the design draft.
3.Customer confirm the design draft.
4.Factory start to produce shipment.
Q4:How to select right model?
You can tell us what you need, and we can help you choose the Model.Basic informations as follows:
Wastewater type : Industry wastewater, Domestic wastewater, food wastewater or others)
Capacity:m³/Day or m³/Hour?
Raw water quality: SS, Oil & Grease &Fat & FOG, PH,BOD,COD content?
Output water quality standard,for discharge or reuse?
Local voltage and frequency?
Q5: What is your MOQ?
Normally, our MOQ is 1 set.
Q6:What is the payment term ?
TT and L/C are acceptable and TT will be more appreciated, 30% deposit, 70% balance payment before shipment.
Q7: We haven't imported before, can you ship the goods to our warehouse?
Yes. Although our normal trade term is EXW, FOB, CIF, we can also arrange logistics to your warehouse.
Q8:What is the delivery time of your factory?
5-10 days for general series products, meanwhile, batches products & customized products would need 15-30 days based on different situations.Contact us for the exact time.
Q9:How do you ensure the quality of your products?
Generally, our equipment are the most durable type in the industry, this is also the feature of the label impression for most of our customers at home or abroad.Skilled workers and strict quality control system can ensure every machine with best working performance.
Q10:How to assemble the equipment once we received it?
The CAD install instruction, assembly procedure and project case will be provided.,Of course our skilled installation engineers would go to your country and install the equipment if needed.
Q11: What is your product warranty ?After sales service?
The warranty is 12 months while the lifetime is 10-15 years under good maintenance.It is durable and anti-corrosion.
Provide equipment certification and installation operating instructions.
Provide one-year spare parts.
Provide technical advisory services.
Provide guidance staff for installation and commissioning.