Customization: | Available |
---|---|
Type: | Aerators |
Method: | Biological Treatment |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
QDCK series Integrated sewage treatment Device is used for Hotels, restaurants, nursing homes, hospitals, residential areas, villages and towns, stations ,airports, ports terminals, ship, factories, mines, military, tourist spots, landscapes, similar to the sewage of various industrial organic wastewater.
Major technique parameter
Model | QDCK1 | QDCK2 | QDCK3 | QDCK5 | QDCK7 | QDCK10 | QDCK15 | QDCK20 | QDCK25 | QDCK30 | QDCK40 | QDCK50 | |
Capacity (m3/h | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 | |
Number of articles | 1 | 1 | 1 | 1 | 2 | 3 | 3 | 4 | 4 | 4 | 5 | 5 | |
Air blower | Amount of air(m3/min) | 0.31 | 0.59 | 0.67 | 1.02 | 1.72 | 2.5 | 4.11 | 4.11 | 2.5×2 | 4.11×2 | 4.11×2 | 4.11×3 |
pressure(m.Mh2o) | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | |
Power (KW) | 0.55 | 0.75 | 1.5 | .5 | 2.2 | 3.7 | 5.5 | 5.5 | 3.7×2 | 5.5×2 | 5.5×2 | 5.5×3 | |
Water pump | capacity (m3/h) | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 |
Head(m) | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |
Power (KW) |
0.55 | 0.55 | 0.55 | 0.75 | 0.75 | 0.75 | 0.75 | 1.5 | 1.5 | 2.2 | 3.7 | 5.5 | |
Space Area(m2) | 6 | 10 | 14 | 19 | 28 | 39 | 58 | 75 | 93 | 113 | 143 | 168 |
Qingdao EVU Environmental & Engineering Equipment Co.,Ltd(EVU) has key technological inputs from it's German partners and over more than 20 years water treatment experience.
Engaged in engineering consulting, design, general contracting and equipment manufacturing of water treatment equipment. Its business spectrum covers both domestic and industrial waste water treatment, pure water treatment, seawater desalination and water recycling.
EVU has very strong commitment to the four cardinal principles of quality standards, system stability, cost control and service-oriented principles as the basis for its survival and development.
1.Provide equipment certification and installation operating instructions.
2.Provide one-year spare parts.
3.Provide technical advisory services.
4.Provide guidance staff for installation and commissioning.