Customization: | Available |
---|---|
Type: | Aerators |
Method: | Biological Treatment |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
dphoModel | QDCK1 | QDCK2 | QDCK3 | QDCK5 | QDCK7 | QDCK10 | QDCK15 | QDCK20 | QDCK25 | QDCK30 | QDCK40 | QDCK50 | |
Capacity (m3/h | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 | |
Number of articles | 1 | 1 | 1 | 1 | 2 | 3 | 3 | 4 | 4 | 4 | 5 | 5 | |
Air blower | Amount of air(m3/min) | 0.31 | 0.59 | 0.67 | 1.02 | 1.72 | 2.5 | 4.11 | 4.11 | 2.5×2 | 4.11×2 | 4.11×2 | 4.11×3 |
pressure(m.Mh2o) | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | |
Power (KW) | 0.55 | 0.75 | 1.5 | .5 | 2.2 | 3.7 | 5.5 | 5.5 | 3.7×2 | 5.5×2 | 5.5×2 | 5.5×3 | |
Water pump | capacity (m3/h) | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 |
Head(m) | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |
Power (KW) |
0.55 | 0.55 | 0.55 | 0.75 | 0.75 | 0.75 | 0.75 | 1.5 | 1.5 | 2.2 | 3.7 | 5.5 | |
Space Area(m2) | 6 | 10 | 14 | 19 | 28 | 39 | 58 | 75 | 93 | 113 | 143 | 168 |
FAQ:
1.Q:Are you a factory or trading company?
A:We are a factory ,we have rich experience for manufacuring water processing equipment for more than 20 ears.
2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in No84, Huantaibei Road, Wangtai, Huangdao, Qingdao, , China .It is about 1 hours from Qingdao airport, Qingdao train station . We can pick you up if you need ,welcome to visit our factory any time.
3.Q:How to buy your idea products?
A:You can provide us your sewage sources,sewage quality ( COD, BOD, SS) , flow rate and ground area (connect us for more details)
4.Q:Do you have certificates?
A:Yes,we have CE, ISO9001, ISO14001,SGS certificate.
5.Q:Can you meet my special requirements or my products?
A:Yes,we have a professional design team.We can provide drawings according to your requirements.
6.Q:How to pay?
A:T/T and L/C are acceptable and T/T will be more appreciated 30% deposit before producing,70% balance before loading by T/T.
7.Q:What is the delivery time ?
A: Generally ,delivery time will be within 20-30 woking days.It depends on order quantity
8.How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And if need, we will send a technicians to guide for installation and debugging. after debugging equipment, we will teach your workers how to use it and how to maintain it.
10.Q:How to keep your equipments from corrosion?
A:We use the world-famous paint ,like Sigma Coatings ,Pain ,Bow, etc. What's more ,we paint strictly according to the standard process.
11.Q:How about the warranty?
A: If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.